MULTI-STORY MULTI-RESIDENCE
|
| ASHLEY PARKCharlotte, NC Our turnkey contract on this project includes the concrete construction services scope of work. The concrete scope of work for the project consists of foundations, foundation walls, columns, and cast-in-place post-tensioned elevated slabs for the 130,000 sf new mixed-use construction. |
|
| ASHTON SOUTHENDCharlotte, NC
|
|
| THE TERRACE AT RIVERPLACECharlotte, NCThe turnkey concrete package consisted of the foundations, walls, formwork, and shoring to construct the eight story the 72,000+sf cast-in-place condominium. Our scope of work also includes the layout, supply of all materials, and labor to construct the cast-in-place project. |
|
| VILLAGE AT SOUTHPARKCharlotte, NCThe turnkey concrete service packages consisted of the foundations, walls, formwork, floor slabs, grading and shoring to construct the nine story concrete structure. Our scope of work also included the layout, supply of all construction materials, and labor to construct the project. The concrete walls for the basement level parking garage consisted of more than 40,000 sf of formwork. Above the concrete parking garage is one level of retail space, which is topped with seven stories of high-end condominiums. This construction project was the latest addition to Charlotte's premier SouthPark Mall area. Wayne Brothers construction team self-performed the work, which will kept the 450,000+sf cast-in-place mixed use project on schedule. |
|
| QUARTERSIDECharlotte, NCOur turnkey contract on this project included a combined package of site work and concrete construction services scope of work for this project, which consists of three buildings. The site work included erosion control, storm drainage, under ground storm water retention system, grading, excavation, and fine grading. The concrete scope of work for the project consisted of foundations, foundation walls, columns, and cast-in-place post-tensioned elevated slabs for the Quad and Ledge buildings, as well as the Row building construction which consisted of typical foundation, and slab on grade construction. |