 | SIEMENS MOB AND CAFERaleigh, NC
Turnkey Concrete Package for Office Building and Cafe included:
Excavating and concrete construction for footings, elevator pits, foundation, elevator pit walls, retaining walls, slabs on grade, elevated slabs on metal deck,and pan stair fill. Completed May 2009 |
 | PREMIER MEDICAL OFFICE BUILDINGHighpoint, NC
This turnkey job included the excavation of footings and mat foundations below grade and back filling and hauling overburden off site. Concrete scope included foundations, slab on grade, basement and retaining walls, elevated slabs on metal deck, pan stair fill, concrete steps and sidewalk, as well as miscellanious pads.
|
 | CMC PINEVILLE ENERGY PLANT REPLACEMENTPineville, NC
Our scope of work included excavation, formwork and pouring the footings; foundation; dock; retaining, tunnel and pit walls; as well as, slabs-on-grade, elevated slabs on metal deck, and elevated shored slabs at the tunnel. Additional work included CIP Retaining Wall. |
 | NORTHEAST MEDICAL CENTERConcord, NC
Vertical Expansion: This turnkey concrete package consisted of lightweight concrete slab-on-metal-deck construction for the two level vertical expansion at the NEMC campus in Concord, NC. This is the fourth facility WBI has completed with Rodgers Builders on the NorthEast Medical Center campus.
Oncology Building: Turnkey concrete package consists of all materials and labor to construct the foundations, and elevated slab-on-metal-deck for the new 96,000 sf addition at the NEMC campus. This is the second construction project WBI has been awarded the contract on the concrete package at the NEMC campus.
|
 | PATEWOOD HOSPITALGreenville, SC
Energy Plant: The turnkey concrete scope-of-work for the new 14,000sf central energy plant included foundations, pits, cast-in-place walls, SOG, and SOMD construction.
Patewood Patient Tower: The turnkey concrete package consisted of all materials and labor to construct the foundations, slab-on-grade, elevated slab-on-metal-deck, cast-in-place wall construction for the new 130,000 sf tower addition at the Carolinas Heath System facility.
Patewood MOB III: The turnkey scope of work on this 150,000 sf project consisted of a 1-story cast-in-place concrete structure, with a 5-story structural steel frame sitting atop the basement level.
Patewood MOB and Parking Deck: Our turnkey concrete scope-of-work for Patewood M.O.B. had our crews utilizing 15,000 CY of cast-in-place concrete on this project, which consists of a 2-story post-tensioned parking structure including a 32,000 sf courtyard designed with concrete planter walls and benches. The parking deck included a total of 436 parking spaces. A 92,000 sf 4-story structural steel frame sits atop the street level parking deck. The schedule sequence included primary completion of the parking deck below the Medical Office Building in conjunction with the remaining 60 percent of the CIP parking deck reaching completion in early December 2004. WBI chose to implement the use of a Tower crane due to site constriction and the owner's request to leave 2000+ trees undisturbed. The project team included four 10 year tenured Superintendents and Project Managers. This project was a great success for our team at WBI and coincided with our 20th anniversary in 2005. |
 | SAINT FRANCIS HOSPITALGreenville, SC
The turnkey scope-of-work for this 84,000sf expansion of the hospital facility includes additions to the emergency department, outpatient, and main building. Our concrete contract includes a all materials and labor for the construction of the foundations, walls, and cast-in-place structure for the multi-story concrete frame building. |
 | GASTON MEMORIAL HOSPITAL EXPANSIONGastonia, NC
This project scope included a four-story cast-in-place concrete superstructure with a connector to the existing hospital. Each level of the superstructure is approximately 100,000 s.f. The first three levels are the parking facility with level four serving as a new Women's Center. The project also included a 25,000 s.f. connecting link between the superstructure and existing hospital. Levels one and four are conventionally reinforced slabs. Levels two and three are post-tensioned concrete slabs. Cast-in-place walls, columns, and slabs total 1,100 tons of reinforcing steel, 180,000 lbs of post-tensioning cables, and 18,000 cubic yards of concrete material. |